KB Homes
|
|
Now the fun really starts. All the browsing you did at the KB Home Studio is
starting to pay off. During this two-week phase, you will begin to recognize the
home you designed and imagine the future you'll create.
- Walls are prime-painted and prepared for final finish, while interior trim,
cabinets, counters and sinks are installed.
- Completion of electrical systems occurs as wire shelving, bath accessories
and mirrors are installed.
- Ceramic tile and any vinyl and/or wood flooring are installed.
- Any necessary grading occurs outside (weather permitting) as hardware
fixtures, shoe molding and carpeting are installed.
- Final touches (gutters, mailboxes, garage door openers, etc.) are completed
as the entire home is cleaned.
|
Quality Checkpoint:
Three quality checkpoints, trim,
pre-carpeting, and pre-final are conducted during this phase:
- Interior trim is examined for fit and quality of installation.
- HVAC systems are finished as a pre-final quality check focuses on all
completed areas of the home.
- Pre-final quality review of entire home.
|
|