During this one-to-three week phase, air conditioning, heating, ventilation,
plumbing and electrical wiring are installed.
- Once the roof is installed, the exterior detail work begins, including trim,
windows and doors.
- HVAC (heating, ventilation, air conditioning) and plumbing systems are
'roughed-in' as exterior trim is completed.
- The electrical system is 'roughed-in' during two days.
- Exterior trim is painted as activity continues inside.
- Roofing and the installation of phone, cable and other electrical systems
occur simultaneously.
Quality Checkpoint:
- All mechanical systems are inspected for quality of installation and proper
functioning.
|