Drywall is stocked in the home while insulation, gas meters and permanent
power connections are installed. It frequently takes two full days to hang
interior drywall. Next, drywall taping and finishing are scheduled to take five
days and blown insulation is installed. After the interior walls are touched up,
the walls and ceiling are textured.
Quality Checkpoint:
- There are two checkpoints before drywall begins and after its completion:
Upon cleaning up any drywall debris, FCMs check all walls and ceilings for
finish and consistency.
|